Two different things: the fixed wiring, inspected every few years, and the kettles and extension leads, checked more often. Neither has a fixed interval in law, so this page sets out what insurers and inspectors expect.

Written for committees, trustees and the people who look after the building, and reviewed by The Venue Record in November 2026. Not legal advice.

Your EICR and PAT dates, kept for you.Hand The Venue Record your electrical report and it reads the date and reminds you before the next one is due.

Set up electrical reminders14-day trial, no card needed

Fixed wiring (EICR): no law sets an interval for a hall, but the wiring has to be kept safe. Industry guidance puts most halls and churches at five years, sooner if the electrician says so. The report gives the date of the next one.

Portable appliances (PAT): no law requires a yearly test. The law requires equipment to be safe; how often you check depends on the risk. For the kettles, urns and extension leads a hall’s hirers use hard, yearly testing is common practice.

Where the duty comes from

The Electricity at Work Regulations 1989 require electrical systems and equipment used at work to be maintained to prevent danger. They apply wherever there are employees, so a hall with a paid caretaker or cleaner is covered. Without employees, the Health and Safety at Work etc. Act 1974 and the hall’s duty to people using the building do the same job in practice.

Neither sets dates. The dates come from guidance: BS 7671 (the wiring regulations), the IET’s guidance on inspection and testing, and HSE’s advice on portable equipment. Insurers and licensing authorities often turn that guidance into a condition.

The fixed wiring: EICR

An Electrical Installation Condition Report is a periodic inspection of the fixed installation: the consumer unit, circuits, sockets, lighting and earthing. A qualified electrician inspects and tests, then gives the installation an overall verdict of satisfactory or unsatisfactory and lists anything that needs attention.

CodeMeansWhat to do
C1Danger presentMake safe straight away. The electrician will usually do this on the day.
C2Potentially dangerousPut right urgently. The report is unsatisfactory until it is.
FIFurther investigation neededGet it investigated without delay.
C3Improvement recommendedNot a fail. Plan it in when you can.

How often: most halls, churches and community centres work to five years, which is what guidance and most diocesan advice recommend for these buildings. A building with heavy use, a bar, outdoor supplies, or a history of problems may be given a shorter date. Whatever the report says for the next inspection is the date to work to.

Keep the full report, not just the front page. If it was unsatisfactory, keep the electrician’s confirmation that the C1 and C2 items were put right.

Portable appliances: PAT

PAT stands for portable appliance testing, and HSE is clear that the law doesn’t require every item to be tested every year. It requires equipment to be safe, and suggests intervals by type of equipment and how it’s used. There are three levels of check:

  1. User checks before use: look at the plug, the lead and the case. Anyone can do these, including hirers.
  2. Formal visual inspections by someone trained to know what to look for, recorded.
  3. Combined inspection and test with a tester, by a competent person, recorded and labelled.

In a hall, the kit that matters most is what’s used hard by people who don’t own it: the urn, kettles, the PA system, extension leads and anything in the kitchen. Testing those yearly is what most halls and insurers settle on. Equipment that hirers bring in is the hirer’s to keep safe; say so in the hire agreement.

Seasonal lights, such as the Christmas tree lights, should be checked before they go up each year. Take anything that fails out of use straight away.

The records to keep

  • The latest EICR in full, with the date the next one is due.
  • Confirmation that any C1, C2 or FI items were dealt with.
  • The PAT register: each item, when it was inspected or tested, the result and who did it.
  • A note of anything taken out of use.

A free portable appliance check log covers the visual checks between tests, with the six things to look for on the sheet.

Got the last electrical installation condition report (EICR)? Take a photo of it and The Venue Record reads the date, works out when the next inspection is due, and reminds you ahead of it. Read my certificate (starts a 14-day trial, no card needed).

Common questions

Is an EICR a legal requirement for a village hall?
No law sets a date for a hall, but the wiring has to be kept safe, and an EICR is how you show it. Five years is the usual interval for halls and churches, unless the electrician recommends sooner.
Is PAT testing a legal requirement?
No. The law requires electrical equipment to be maintained so it is safe. HSE says how often to inspect or test depends on the type of equipment and how it's used. Yearly testing of the hall's own heavily used items is common practice and often an insurance expectation.
Can a volunteer do PAT testing?
User checks and formal visual inspections can be done by a volunteer who knows what to look for. Testing with a PAT tester needs someone competent to use it and interpret the results; they don't have to be an electrician.
What does C3 mean on an EICR?
Improvement recommended. It isn't a fail and doesn't make the report unsatisfactory. C1 (danger present) and C2 (potentially dangerous) do.

Your EICR and PAT dates, kept for you

Hand The Venue Record your electrical report and it reads the date and tells you before the next one is due. PAT checks are reminded and recorded too.

Set up electrical remindersSee it working first

No card needed to start. Then from £19 a month per building.

A plain-English summary for the people who run community buildings, not legal advice. Where your own fire risk assessment, lease, licence or insurer says something different, follow that.

Regulation updates, monthly

What changed in premises safety regulation, what it means for a site like yours, and what if anything needs doing about it. We will email when the Martyn's Law commencement date is confirmed.

One email a month. Unsubscribe in one click. We do not pass your address to anyone.